Skip to content

Desktop App Overview

The Gunsole desktop app is where your logs end up. It’s a desktop application that runs on macOS, Windows, and Linux.

A project dashboard showing log stats, discovered tags, and buckets

  1. Receives logs — runs an HTTP server on localhost:17655
  2. Stores them — in a local SQLite database
  3. Displays them — in a real-time, virtualized log table
  4. Filters them — by level, bucket, tags, message search, time range
  5. Live widgets — real-time cards, progress bars, tables, and charts driven straight from your code. See Live Widgets
SDK (your app)
↓ POST /logs (gzip JSON)
HTTP Server (port 17655)
↓ async channel
Log Batcher (buffers per project)
↓ flush every 100ms or 50 logs
SQLite (local database)
↓ event
UI (virtualized table)

The HTTP server accepts logs and returns 200 OK immediately. Logs are processed asynchronously — batched, stored in the database, and emitted to the UI as events. This keeps ingestion fast even under high log volume.

  • Virtualized rendering — handles 100K+ log entries smoothly
  • Server-side filtering — all filtering happens via SQL, not in the UI layer
  • Indexed queries — timestamps, levels, buckets, and tags all have database indexes
  • Log batching — incoming logs are buffered and flushed in batches to reduce rendering churn
  • Gzip decompression — the server automatically handles compressed payloads

SQLite with WAL mode, stored locally. No external database, no server, no configuration.

Tables: workspaces, projects, buckets, filters, logs, tags, log_tag_map, app_preferences. Migrations run automatically on startup.

See Installation for database file locations per OS.

Projects, buckets, and tags are all auto-created. The first time the app receives a log with a new projectId, it creates the project. First time it sees a new bucket name, it creates the bucket. First time it sees a new tag key-value pair, it indexes it. Each new project gets a default “All Logs” filter.

You never need to configure anything before sending logs.

  • Main Window: App shell with sidebar + content area. macOS overlay title bar with traffic lights and drag region. Closing hides to tray (doesn’t quit).
  • Settings Window: Separate dedicated window (750x650). Opened via Cmd+, / gear icon / tray menu. If already open, focuses and navigates to the requested section.
  • Inspector Window: Per-log detail view (700x800). Reuses existing window for same log ID. Shows full context JSON, tags as chips, and all metadata fields.
  • New Window: Cmd+N / Ctrl+N creates a new main window instance, optionally scoped to a workspace.
  • Icon: Custom monotone icon, uses template mode on macOS (adapts to light/dark menu bar).
  • Menu: Open Gunsole, Settings…, Exit.
  • Left-click: Show and focus the main window.
  • Behavior: Main window hides on close (stays in tray). App runs in background receiving logs even when all windows are hidden.

Full system menu bar with keyboard accelerators:

  • macOS: Gunsole | File | View | Go | Filter | Logs | Window | Help
  • Windows/Linux: File | View | Go | Filter | Logs | Help
MenuItems
ViewToggle Sidebar, Zoom In/Out/Reset, Full Screen, Refresh Logs
GoQuick Switch (Cmd+K), Back, Forward
FilterNew Filter, Save Filter, Duplicate Filter, Reset Filter, Toggle individual levels (Cmd+1–4)
LogsExport Logs, Copy Selected, Pause/Resume Live Tail, Scroll to Top/Bottom, Project Data (opens settings)
HelpDocumentation, Keyboard Shortcuts (Cmd+/)

Opens in a separate window with these sections:

  • Workspace Management: Create, rename, delete, and reorder workspaces. Custom emoji icons from a curated icon set. Default workspace (“Unsorted”) is locked.
  • Project Settings: Per-project log retention days, auto-delete toggle. Clear logs per project or per bucket. Project workspace assignment, rename, delete. Accessible via /settings/projects and /settings/projects/$projectId.
  • General Preferences: Theme selection (Auto / Light / Dark).
  • About Gunsole: App version, platform info, links to GitHub and documentation.
  • Danger Zone: “Clear All Logs” (keeps structure — projects, buckets, filters remain) and “Clear All Data” (nuclear reset — deletes everything, recreates default workspace). Both require confirmation.

Gunsole updates itself. The app periodically checks releases.gunsole.com for a newer version, and if one’s available, you can download and install it right from Settings → About — no separate installer, no manual download from a website. Install the app once and it stays current.

You can sign in with email or GitHub from the settings window, but you never have to. Sign-in is entirely optional and doesn’t gate any feature — Gunsole is fully free and works 100% offline, with no account required. Signing in is only useful if you plan to use account-linked features down the line; the desktop app itself works the same either way.

  • Quick switcher dialog for navigating across all projects and filters
  • Fuzzy search by project name, filter name, or workspace name
  • Arrow keys + Enter to navigate, Escape to close
ShortcutAction
Cmd+, (Ctrl+,)Open Settings
Cmd+N (Ctrl+N)New Window
Cmd+K (Ctrl+K)Quick Switch (Command Palette)
Cmd+B (Ctrl+B)Toggle Sidebar
Cmd+R (Ctrl+R)Refresh Logs
Cmd+= / Cmd+- / Cmd+0Zoom In / Out / Reset
Cmd+F (Ctrl+F)Full Screen
Cmd+[ / Cmd+]Navigate Back / Forward
Cmd+Shift+NNew Filter
Cmd+S (Ctrl+S)Save Filter
Cmd+DDuplicate Filter
Cmd+1 / 2 / 3 / 4Toggle Info / Debug / Warn / Error
Cmd+E (Ctrl+E)Export Logs
Cmd+Shift+CCopy Selected Logs
Cmd+P (Ctrl+P)Pause/Resume Live Tail
Cmd+Up / Cmd+DownScroll to Top / Bottom
Cmd+A (Ctrl+A)Select All Logs
Cmd+/ (Ctrl+/)Keyboard Shortcuts Reference
  • Color Palette: Grayscale (50–900) with green accent #22C55E.
  • Log Level Colors: Info (grey), Debug (light grey), Warn (amber #F59E0B), Error (red #EF4444), Fatal (error.dark).
  • Typography: IBM Plex Sans, 12px base.
  • Light/Dark Mode: Full support with system auto-detection and manual override.
  • UI Style: Border-based (no shadows), no ripple effects, custom scrollbars.
  • Fixed bottom-right corner, stacked vertically.
  • Severities: success, info, warning, error.
  • Auto-dismiss after 4 seconds with manual close button.

Shown on first launch or when no project is selected. Contains:

  1. Gunsole logo and tagline: “A bucket-based log viewer”
  2. SDK installation command: pnpm add @gunsole/web
  3. Copyable quick-start code example
  4. “How it works” explainer (bucket grouping, auto-sidebar, saved filters, local persistence)
  5. Listening status: http://localhost:17655

When logs arrive, the app emits events to update the UI instantly:

EventPayloadDescription
gunsole-log-batch{ projectId, logs }New logs arrived
gunsole-new-projectProjectProject auto-created
gunsole-new-bucketBucketBucket auto-created
gunsole-tags-updated—New tags discovered
RouteView
/welcomeGetting started page
/project/$projectIdProject dashboard
/project/$projectId/$filterIdLog viewer with filter
/inspector/$logIdLog inspector (separate window)
/settingsSettings (separate window)
/settings/projectsProject list
/settings/projects/$projectIdProject settings